Description

Atherton Elementary is located Houston’s fifth ward, where it provides students an academic curriculum to prepare them for middle school. It provides a full range of extracurricular activities, including band and choir.

Scope of Work

New school for up to 750 students.

Project Status

Construction is complete and the project is in warranty. The school staff moved into the new building in July to start the Fall 2013 semester as residents in the new facility. Final documentation is in progress for LEED certification.

Key Facts

  • Budget: $15,914,119
  • Project Type: New Schools: Replacements
  • District: District II - Rhonda Skillern-Jones
  • Location: 2011 Solo

Have a question or comment?

Please submit your question or suggestion about this school project to bondinfo@houstonisd.org
and an HISD representative will follow up.

Information

Indicator
Indicator
ID
C-066 
Project/School/Facility
Budget
$6,791,693 
Target Construction Start
2nd Qtr. 2013 
Target Construction Completion
4th Qtr. 2014 
Phase
Design - Const. Documents 
% of Phase
95% 
Project Team
Manager: Chris Koeper
Architect: Harrison Kornberg
Contractor: DivisionOne
CMPA: N/A
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, restrooms upgrade, bus drive creation, renovation of science labs, and new administration area. 
Status
The conversion of Ryan MS in to the Baylor College of Medicine @ Ryan was successfully accomplished for the 2013/2014 school year. Construction Documents for phase 2 are being reviewed by City of Houston. The bus drive plans are approved and permitted. Phase 2 Construction is anticipated to start second quarter 2014. 
Notes
none 
Indicator
Indicator
ID
C-120 
Project/School/Facility
Budget
$2,919,095 
Target Construction Start
4th Qtr. 2013 
Target Construction Completion
2nd Qtr. 2014 
Phase
Construction 
% of Phase
95% 
Project Team
Manager: Meredith Smith
Architect: Ambrose & House
Contractor: ICI Construction
CMPA: AECOM
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, electrical improvements, a suspended ceiling, exterior wall finishes, a new PA system, new door hardware, restroom upgrades, paving improvements, and ADA code compliance. 
Status
The project is near substantial completion and documents are being prepared for approval. Punch list work is ongoing. Closeout documents are underway. 
Notes
The original schedule was to start construction second quarter 2012 with an anticipated completion being first quarter 2013. The general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above. 
Indicator
Indicator
ID
C-122 
Project/School/Facility
Budget
$3,693,189 
Target Construction Start
2nd Qtr. 2013 
Target Construction Completion
2nd Qtr. 2014 
Phase
Construction 
% of Phase
95% 
Project Team
Manager: Meredith Smith
Architect: Natex Corporation
Contractor: Prime Contractors
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, exterior drainage, reception area modifications, fire alarm upgrade, flooring and fencing replacement, sitework, and ADA code compliance. 
Status
The project is near substantial completion and documents are being prepared for approval. Punch list work is ongoing. Closeout documents are underway. 
Notes
A separate roof project is anticipated to be presented for approval to the school board in April 2014, with construction scheduled to occur through the third quarter 2014. 
Indicator
Indicator
ID
C-287 
Project/School/Facility
Budget
$1,074,475 
Target Construction Start
2nd Qtr. 2014 
Target Construction Completion
4th Qtr. 2014 
Phase
Bid & Award 
% of Phase
50% 
Project Team
Manager: Bruce Green
Architect: RdlR Architects
Contractor: Job Order Contractor
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
Status
Construction documents are complete and have been submitted for permit. HISD contractors are pricing the scope of work. 
Notes
none 
Indicator
Indicator
ID
C-123 
Project/School/Facility
Budget
$1,650,032 
Target Construction Start
2nd Qtr. 2014 
Target Construction Completion
4th Qtr. 2014 
Phase
Bid & Award 
% of Phase
95% 
Project Team
Manager: Meredith Smith
Architect: PBK Architects
Contractor: Prime Contractors
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, lighting, playground equipment, technology improvements, and ADA code compliance. 
Status
The contract for construction is being executed. The building permit is approved. The Notice to Proceed will be issued second quarter 2014. 
Notes
The project schedule has been adjusted to reflect the negotiated schedule with the awarded contractor. 
Indicator
Indicator
ID
C-290 
Project/School/Facility
Budget
$4,454,891 
Target Construction Start
4th Qtr. 2013 
Target Construction Completion
3rd Qtr. 2014 
Phase
Construction 
% of Phase
98% 
Project Team
Manager: Chris Koeper
Architect: Prozign Architects
Contractor: ICI Construction
CMPA: N/A
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
Status
Final signage, misc. change orders and air handling unit replacement will take place through second quarter 2014. Controls will be installed concurrently with the air handling unit replacement. Low voltage systems will be installed during the summer of 2014. 
Notes
The original general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above. 
Indicator
Indicator
ID
C-044 
Project/School/Facility
Budget
$14,542,604 
Target Construction Start
4th Qtr. 2012 
Target Construction Completion
2nd Qtr. 2014 
Phase
Construction 
% of Phase
98% 
Project Team
Manager: Lloyd Hart
Architect: RDC Architects
Contractor: DT Construction Co.
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, parking repairs, science laboratory upgrades, exterior window replacement, and ADA code compliance. 
Status
The project is near substantial completion and documents are being prepared for approval. Punch list work is ongoing. A separate roof project is anticipated to be presented for approval to the school board in April 2014, with construction scheduled to occur through third quarter 2014. 
Notes
none 
Indicator
Indicator
ID
C-297 
Project/School/Facility
Budget
$3,606,928 
Target Construction Start
2nd Qtr. 2012 
Target Construction Completion
2nd Qtr. 2014 
Phase
Close-Out 
% of Phase
95% 
Project Team
Manager: Bruce Green
Architect: Molina Walker
Contractor: Prime Contractors
CMPA: Rice & Gardner
 
General Overview
Renovations, including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
Status
Closeout Documents have been reviewed and are nearly complete. Roof replacement contract with Rain Seal Master is in progress. 
Notes
none 
Indicator
Indicator
ID
C-045 
Project/School/Facility
Budget
$3,416,394 
Target Construction Start
3rd Qtr. 2013 
Target Construction Completion
2nd Qtr. 2014 
Phase
Construction 
% of Phase
90% 
Project Team
Manager: Bruce Green
Architect: Collaborate Architects
Contractor: Prime Contractors
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
Status
The renovation work in Buildings F & H and on the elevator is underway. Substantial completion is expected the end of second quarter 2014. 
Notes
none 
Indicator
Indicator
ID
C-139 
Project/School/Facility
Budget
$521,583 
Target Construction Start
TBD 
Target Construction Completion
TBD 
Phase
TBD 
% of Phase
TBD 
Project Team
Manager: Meredith Smith
Architect: PBK Architects
Contractor: TBD
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
Status
This project scope is being re-evaluated. 
Notes
This project was placed on hold to give the Board of Education time to consider repurposing of the campus. 
Indicator
Indicator
ID
C-148 
Project/School/Facility
Budget
$1,248,399 
Target Construction Start
2nd Qtr. 2013 
Target Construction Completion
2nd Qtr. 2014 
Phase
Close-Out 
% of Phase
90% 
Project Team
Manager: Bruce Green
Architect: Cre8 Architects
Contractor: Prime Contractors
CMPA: Rice & Gardner
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
Status
This project is in the Shearn, Kolter & Elrod package. The project is substantially complete and now in the close out stage. 
Notes
none 
Indicator
Indicator
ID
C-155 
Project/School/Facility
Budget
$1,376,369 
Target Construction Start
2nd Qtr. 2014 
Target Construction Completion
4th Qtr. 2014 
Phase
Bid & Award 
% of Phase
75% 
Project Team
Manager: Bruce Green
Architect: Courtney Harper
Contractor: Job Order Contractor
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
Status
Pricing has been received and is being reviewed. The building permit is in progress. Work is planned to start the end of second quarter 2014. 
Notes
none 
Indicator
Indicator
ID
C-283 
Project/School/Facility
Budget
$1,489,948 
Target Construction Start
2nd Qtr. 2013 
Target Construction Completion
1st Qtr. 2014 
Phase
Construction 
% of Phase
95% 
Project Team
Manager: Meredith Smith
Architect: Natex Corporation
Contractor: Prime Contractors
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical systems upgrades, fire alarm upgrade, intercom replacement, markerboard replacement, flooring and fencing replacement, sitework, and ADA code compliance. 
Status
The project is near substantial completion and documents are being prepared for approval. Punch list work is ongoing. Closeout documents are underway. 
Notes
none 
Indicator
Indicator
ID
C-159 
Project/School/Facility
Budget
$1,250,726 
Target Construction Start
1st Qtr. 2014 
Target Construction Completion
3rd Qtr. 2014 
Phase
Bid & Award 
% of Phase
95% 
Project Team
Manager: Meredith Smith
Architect: PBK Architects
Contractor: Prime Contractors
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, roofing repairs, technology improvements, and ADA code compliance. 
Status
The contract for construction is being executed. The building permit is approved. The Notice to Proceed will be issued for second quarter 2014. 
Notes
The project schedule has been adjusted to reflect the negotiated schedule with the awarded contractor. 
Indicator
Indicator
ID
C-262 
Project/School/Facility
Budget
$3,892,924 
Target Construction Start
3rd Qtr. 2013 
Target Construction Completion
2nd Qtr. 2014 
Phase
Construction 
% of Phase
95% 
Project Team
Manager: Meredith Smith
Architect: MLB and Associates
Contractor: Prime Contractors
CMPA: AECOM Design
 
General Overview
Renovations including safety/security improvements, mechanical/electrical/plumbing system improvements, exterior doors, door hardware, restrooms upgrade, replacement of new elevator, and ADA code compliance. 
Status
Interior finishes and lighting are being completed. The work is expected to be substantially complete in second quarter 2014. 
Notes
none 
Indicator
Indicator
ID
C-049 
Project/School/Facility
Budget
$2,820,682 
Target Construction Start
4th Qtr. 2013 
Target Construction Completion
2nd Qtr. 2014 
Phase
Construction 
% of Phase
95% 
Project Team
Manager: Meredith Smith
Architect: Ambrose & House
Contractor: ICI Construction
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, exterior doors, door hardware, restrooms upgrade, replacement of new elevator, and ADA code compliance. 
Status
The project is near substantial completion and documents are being prepared for approval. Punch list work is ongoing. Closeout documents are underway. 
Notes
The original general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above. 
Indicator
Indicator
ID
C-169 
Project/School/Facility
Budget
$2,348,243 
Target Construction Start
4th Qtr. 2013 
Target Construction Completion
2nd Qtr. 2014 
Phase
Construction 
% of Phase
95% 
Project Team
Manager: Meredith Smith
Architect: Ambrose & House
Contractor: ICI Construction
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, lighting, exterior, interior doors and hardware, window replacements, restrooms upgrade, fencing and ADA code compliance. 
Status
The project is near substantial completion and documents are being prepared for approval. Punch list work is ongoing. Closeout documents are underway. 
Notes
The original general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above. 
Indicator
Indicator
ID
C-053 
Project/School/Facility
Budget
$10,617,671 
Target Construction Start
1st Qtr. 2014 
Target Construction Completion
4th Qtr. 2014 
Phase
Bid & Award 
% of Phase
100% 
Project Team
Manager: Meredith Smith
Architect: English + Associates
Contractor: Comex
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, new lighting, a new bus canopy, paving repairs, restroom upgrades, improved interior finishes, auditorium seating, bleachers, signage, and ADA code compliance. 
Status
The contract for the renovation has been executed. The building permit has been submitted for final approval. The Notice to Proceed will be issued in second quarter 2014. 
Notes
In addition to the 2007 scope of work the 2012 restroom renovation work will continue with the same project team through third quarter 2015. 
Indicator
Indicator
ID
C-050 
Project/School/Facility
Budget
$3,428,277 
Target Construction Start
4th Qtr. 2012 
Target Construction Completion
4th Qtr. 2013 
Phase
Close-Out 
% of Phase
90% 
Project Team
Manager: Bruce Green
Architect: Ambrose & House
Contractor: Prime Contractors
CMPA: Rice & Gardner
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements and ADA code compliance. 
Status
Construction is complete and in the closeout phase. The project is under warranty. 
Notes
none 
Indicator
Indicator
ID
C-054 
Project/School/Facility
Budget
$14,347,354 
Target Construction Start
1st Qtr. 2011 
Target Construction Completion
3rd Qtr. 2012 
Phase
Close-Out 
% of Phase
90% 
Project Team
Manager: Bruce Green
Architect: Autoarch Architects
Contractor: Summit Builders
CMPA: Rice & Gardner
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
Status
Closeout documents are complete. The original contractor failed to complete punch list items. A job order contractor and annual vendors are completing this work at the cost of the original contractor. 
Notes
none 
Indicator
Indicator
ID
C-182 
Project/School/Facility
Budget
$1,526,081 
Target Construction Start
1st Qtr. 2012 
Target Construction Completion
1st Qtr. 2014 
Phase
Close-Out 
% of Phase
50% 
Project Team
Manager: Meredith Smith
Architect: Corgan+PBA
Contractor: First Nat. Ins./Comex
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, restroom upgrades, roof repairs, parking lot expansion, and ADA code compliance. 
Status
Punch list work is nearing completion. 
Notes
The original general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above. 
Indicator
Indicator
ID
C-055 
Project/School/Facility
Budget
$10,641,458 
Target Construction Start
2nd Qtr. 2014 
Target Construction Completion
4th Qtr. 2014 
Phase
Bid & Award 
% of Phase
98% 
Project Team
Manager: Bruce Green
Architect: RWS Architects
Contractor: ICI Construction
CMPA: Rice & Gardner
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, refurbishing exterior and interior finishes, science laboratory upgrades, and ADA code compliance modifications. 
Status
An HVAC replacement package was approved by the school board in March 2014. Construction is anticipated to start immediately following finalization of the contract. 
Notes
Phase 1 was completed and project team is in final negotiations for close-out of the original contract. 
Indicator
Indicator
ID
C-079 
Project/School/Facility
Budget
$4,304,767 
Target Construction Start
2nd Qtr. 2014 
Target Construction Completion
3rd Qtr. 2014 
Phase
Bid & Award 
% of Phase
25% 
Project Team
Manager: Meredith Smith
Architect: Hill + Swart
Contractor: Job Order Contractor
CMPA: AECOM Design
 
General Overview
Renovations include safety/security systems improvements, mechanical/electrical/plumbing systems, fire alarm repair, intercom replacement, door and hardware replacement, science lab venting and fume hoods, sitework, construction of a fire truck access lane, and ADA code compliance. 
Status
Pricing/scope documents for light fixture replacement, egress lighting, and exit lighting are in progress. Pricing has been accepted for additional access control at entry doors. 
Notes
none 
Indicator
Indicator
ID
C-189 
Project/School/Facility
Budget
$737,591 
Target Construction Start
2nd Qtr. 2013 
Target Construction Completion
3rd Qtr. 2014 
Phase
Close-Out 
% of Phase
90% 
Project Team
Manager: Bruce Green
Architect: Cre8 Architects
Contractor: Prime Contractors
CMPA: Rice & Gardner
 
General Overview
Renovations including safety/security systems improvements and ADA code compliance. 
Status
This project is in the Shearn, Kolter & Elrod package. The project is substantially complete and now in the close out stage. 
Notes
none 
Indicator
Indicator
ID
C-263 
Project/School/Facility
Budget
$1,365,658 
Target Construction Start
2nd Qtr. 2014 
Target Construction Completion
3rd Qtr. 2014 
Phase
Bid & Award 
% of Phase
95% 
Project Team
Manager: Meredith Smith
Architect: PBK Architects
Contractor: Prime Contractors
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, technology improvements, and ADA code compliance. 
Status
The contract for construction is being executed. The building permit is approved. The Notice to Proceed will be issued for second quarter 2014. 
Notes
The project schedule has been adjusted to reflect the negotiated schedule with the awarded contractor. 
Indicator
Indicator
ID
C-128 
Project/School/Facility
Budget
$1,876,149 
Target Construction Start
2nd Qtr. 2013 
Target Construction Completion
1st Qtr. 2014 
Phase
Construction 
% of Phase
95% 
Project Team
Manager: Meredith Smith
Architect: Natex Architects
Contractor: Prime Contractors
CMPA: AECOM Design
 
General Overview
Renovations include safety/security systems improvements, mechanical and electrical systems upgrades, fire alarm upgrade, intercom replacement, marker board replacement, parking lot expansion, flooring replacement, sitework, and ADA code compliance. 
Status
The project is near substantial completion and documents are being prepared for approval. Punch list work is ongoing. Closeout documents are underway. 
Notes
none 
Indicator
Indicator
ID
C-201 
Project/School/Facility
Budget
$1,380,693 
Target Construction Start
2nd Qtr. 2013 
Target Construction Completion
2nd Qtr. 2014 
Phase
Construction 
% of Phase
95% 
Project Team
Manager: Meredith Smith
Architect: RWS Architects
Contractor: Jamail & Smith, Ohms Electric, CLS, AMS
CMPA: AECOM Design
 
General Overview
Renovations including replacing electrical system components, resolution of structural issues, door repairs, PA system and ADA code compliance, tree trimming and treatment, and masonry repairs. 
Status
The existing canopy modifications are near completion. 
Notes
none 
Indicator
Indicator
ID
C-062 
Project/School/Facility
Budget
$12,053,989 
Target Construction Start
3rd Qtr. 2012 
Target Construction Completion
3rd Qtr. 2013 
Phase
Close-Out 
% of Phase
90% 
Project Team
Manager: Bruce Green
Architect: Autoarch Architects
Contractor: Satterfield & Pontikes
CMPA: Rice & Gardner
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing, and ADA code compliance. This project will also include an addition to the school that features a science lab and classrooms. 
Status
Construction is complete and in the closeout phase. The project is under warranty. 
Notes
Additional egress lighting is being installed by annual vendor. 
Indicator
Indicator
ID
C-222 
Project/School/Facility
Budget
$1,025,084 
Target Construction Start
TBD 
Target Construction Completion
TBD 
Phase
TBD 
% of Phase
TBD 
Project Team
Manager: Bruce Green
Architect: STOA International
Contractor: TBD
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
Status
This project scope is being reevaluated. 
Notes
This project was placed on hold to give the Board of Education time to consider repurposing of the campus. 
Indicator
Indicator
ID
C-223 
Project/School/Facility
Budget
$3,000,326 
Target Construction Start
2nd Qtr. 2014 
Target Construction Completion
4th Qtr. 2014 
Phase
Schematic Design 
% of Phase
98% 
Project Team
Manager: Bruce Green
Architect: RdlR Architects
Contractor: TBD
CMPA: AECOM Design
 
General Overview
Renovations, including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
Status
Construction Documents are complete and the permit submittal made. The project is being issued for competitive bids in second quarter 2014. 
Notes
none 
Indicator
Indicator
ID
C-060 
Project/School/Facility
Budget
$1,758,507 
Target Construction Start
2nd Qtr. 2013 
Target Construction Completion
2nd Qtr. 2014 
Phase
Construction 
% of Phase
95% 
Project Team
Manager: Bruce Green
Architect: Sustaita Architects
Contractor: DT Construction
CMPA: Rice & Gardner
 
General Overview
Renovations including Replacement of storefronts; floor finishes (VCT, ceramic); ceiling finishes (acoustical tile); science classroom millwork; wall finishes (Paint, ceramic tile); masonry (CMU); restroom partitions, plumbing and fixture upgrades; exhaust fan additions; exterior lighting; site work. 
Status
The new flooring, science classroom, and first floor restroom renovations are complete. The second floor restroom renovations and selected window and door replacements have been completed. 
Notes
In addition to the 2007 scope of work the 2012 restroom renovation work has been added and will be completed with the same project team. 
Indicator
Indicator
ID
C-039 
Project/School/Facility
Budget
$7,652,171 
Target Construction Start
2nd Qtr. 2013 
Target Construction Completion
2nd Qtr. 2014 
Phase
Construction 
% of Phase
90% 
Project Team
Manager: Bruce Green
Architect: Sustaita Architects
Contractor: DT Construction
CMPA: Rice & Gardner
 
General Overview
Renovations including storefront and curtain wall replacement, HVAC replacement and repairs, electrical panel replacement, electrical upgrades, door and window replacement, ceramic tile floor and carpet replacement, restroom renovations, plumbing fixture replacements, drinking fountain additions, millwork upgrades, suspended ceiling repairs and replacement, abatement, PA additions and signage. 
Status
Cafeteria, gymnasium and library renovations are complete along with the first floor restrooms. The restroom renovations, HVAC upgrades, and select window and door replacement are ongoing. 
Notes
In addition to the 2007 scope of work additional restroom renovations work was added to accommodate the special needs of this school. This additional scope will be completed late second quarter 2014. 
Indicator
Indicator
ID
C-232 
Project/School/Facility
Budget
$3,835,444 
Target Construction Start
2nd Qtr. 2014 
Target Construction Completion
3rd Qtr. 2014 
Phase
Bid & Award 
% of Phase
80% 
Project Team
Manager: Meredith Smith
Architect: Harrison Kornberg
Contractor: Job Order Contractor
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, roof repairs, restrooms upgrade, science laboratory upgrades, elevator installation, and ADA code compliance. 
Status
Pricing is being reviewed. The submittal for building permit has been made. 
Notes
none 
Indicator
Indicator
ID
C-234 
Project/School/Facility
Budget
$11,045,217 
Target Construction Start
1st Qtr. 2013 
Target Construction Completion
2nd Qtr. 2014 
Phase
Close-Out 
% of Phase
5% 
Project Team
Manager: Bruce Green
Architect: STOA International
Contractor: Satterfield & Pontikes
CMPA: Rice & Gardner
 
General Overview
A middle school addition and renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
Status
The school has moved into the new addition. Final site work, punch list and closeout is ongoing. 
Notes
A separate roof project is anticipated to be presented for approval to the school board in April 2014, with construction scheduled to occur through the fourth quarter 2014. Temporary repairs have been completed to prevent further water intrusion. 
Indicator
Indicator
ID
C-281 
Project/School/Facility
Budget
$802,211 
Target Construction Start
2nd Qtr. 2014 
Target Construction Completion
3rd Qtr. 2014 
Phase
Bid & Award 
% of Phase
75% 
Project Team
Manager: Bruce Green
Architect: Courtney Harper
Contractor: Job Order Contractor
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements and ADA compliance. 
Status
Pricing has been received and is being reviewed. The building permit is in progress. 
Notes
none 
Indicator
Indicator
ID
C-239 
Project/School/Facility
Budget
$2,479,845 
Target Construction Start
2nd Qtr. 2013 
Target Construction Completion
4th Qtr. 2013 
Phase
Close-Out 
% of Phase
90% 
Project Team
Manager: Bruce Green
Architect: Cre8 Architects
Contractor: Prime Contractors
CMPA: Rice & Gardner
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, site work, exterior and interior finishes, technology systems improvements, and ADA code compliance. 
Status
This project is in the Shearn, Kolter & Elrod package. The project is substantially complete and now in the close out stage. 
Notes
none 
Indicator
Indicator
ID
C-240 
Project/School/Facility
Budget
$18,189,731 
Target Construction Start
3rd Qtr. 2012 
Target Construction Completion
4th Qtr. 2013 
Phase
Close-Out 
% of Phase
90% 
Project Team
Manager: Travis Stanford
Architect: Collaborate
Contractor: Comex Corporation
CMPA: N/A
 
General Overview
New school for 750 students. 
Status
Construction is complete and is in the warranty phase. Certificate of Occupancy has been obtained. The campus occupied the new facility fourth quarter 2013. Final documentation is in progress for LEED certification. 
Notes
none 
Indicator
Indicator
ID
C-242 
Project/School/Facility
Budget
$17,049,186 
Target Construction Start
2nd Qtr. 2014 
Target Construction Completion
4th Qtr. 2014 
Phase
Bid & Award 
% of Phase
98% 
Project Team
Manager: Travis Stanford
Architect: Brave Architecture
Contractor: Comex Corporation
CMPA: N/A
 
General Overview
School expansion. 
Status
The new classroom/administrative wing (Phase 1) is complete. The school moved into this portion of the building over Thanksgiving 2013 weekend. Classes resumed December 2, 2013. The library and cafeteria (Phase 2) plans have been approved by the City of Houston and the construction is scheduled to start second quarter 2014. 
Notes
The additional scope of work, including the library and cafeteria will be completed second quarter 2015. 
Indicator
Indicator
ID
C-244 
Project/School/Facility
Budget
$12,725,004 
Target Construction Start
3rd Qtr. 2012 
Target Construction Completion
2nd Qtr. 2014 
Phase
Construction 
% of Phase
85% 
Project Team
Manager: Bruce Green
Architect: Collaborate Architects
Contractor: Morganti Const.
CMPA: Rice & Gardner
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. This project will include two additions to the school, a new multi-purpose building and a new Administration/Library wing. An additional project to replace the roof is currently planned for the third quarter 2014. 
Status
The construction of the new Library/Admin wing and Multi-Purpose Bldg are near completion. After the move into the new addition, the temporary buildings will be removed from the site and the paving and remaining site work will be completed. 
Notes
A separate roof project is anticipated to be presented for approval to the school board in April 2014, with construction scheduled to occur through the third quarter 2014. 
Indicator
Indicator
ID
C-098 
Project/School/Facility
Budget
$3,230,362 
Target Construction Start
2nd Qtr. 2012 
Target Construction Completion
4th Qtr. 2013 
Phase
Close-Out 
% of Phase
90% 
Project Team
Manager: Bruce Green
Architect: RWS Architects
Contractor: Prime Contractors
CMPA: Rice & Gardner
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
Status
Construction is complete and in the closeout phase. The project is under warranty. 
Notes
none 
Indicator
Indicator
ID
C-248 
Project/School/Facility
Budget
$6,310,699 
Target Construction Start
1st Qtr. 2012 
Target Construction Completion
4th Qtr. 2013 
Phase
Close-Out 
% of Phase
90% 
Project Team
Manager: Bruce Green
Architect: Pfluger Associates
Contractor: Solidarity / Jamail & Smith
CMPA: Rice & Gardner
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, exterior finishes, and ADA code compliance. 
Status
Minor punch list items are remaining to be completed. The HVAC replacement work is complete. Project is substantially complete. 
Notes
none 
Indicator
Indicator
ID
C-252 
Project/School/Facility
Budget
$3,177,976 
Target Construction Start
1st Qtr. 2014 
Target Construction Completion
4th Qtr. 2014 
Phase
Construction 
% of Phase
15% 
Project Team
Manager: Meredith Smith
Architect: RWS Architects
Contractor: Comex Corporation
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, replacing lighting, flooring, casework, ceilings in classrooms, revising admin area, new PA building alarm and fire alarm system. 
Status
Phase 2 classroom renovation is underway. 
Notes
none 
Indicator
Indicator
ID
C-258 
Project/School/Facility
Budget
$3,712,925 
Target Construction Start
4th Qtr. 2013 
Target Construction Completion
3rd Qtr. 2014 
Phase
Construction 
% of Phase
95% 
Project Team
Manager: Chris Koeper
Architect: Prozign Architects
Contractor: ICI Construction
CMPA: N/A
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
Status
Renovation and interior finishes are ongoing, including the elevator installation and misc. long lead items. Low voltage systems will be complete by third quarter 2014. 
Notes
The original schedule was to start construction second quarter 2012 with an anticipated completion being first quarter 2013. The general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above. 
Indicator
Indicator
ID
C-260 
Project/School/Facility
Budget
$2,794,217 
Target Construction Start
2nd Qtr. 2014 
Target Construction Completion
4th Qtr. 2014 
Phase
Design - Const. Documents 
% of Phase
60% 
Project Team
Manager: Meredith Smith
Architect: VLK Architects
Contractor: Renovation:TBD/Window Replacement:Jamail & Smith
CMPA: AECOM Design
 
General Overview
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, interior and exterior finishes, windows, technology improvements, and ADA code compliance. 
Status
The construction contract for window replacement has been approved. The CMAR evaluations are underway with a recommendation being submitted to the April Board meeting. 
Notes
none 

Last Updated: 12/13/2013