Work Order Priority
-
FACILITIES SERVICES WORK ORDER CATEGORIES
PRIORITY 1- Emergency
Definition: Work that poses an immediate danger to public health and safety, may cause a disruption to normal operations, and could potentially cause catastrophic financial loss. Emergency Work Orders address the following types of problems:- Asbestos disturbance
- Power outage
- Ruptured water lines
- Heating or air conditioning failure (to a wing of a building, a larger-than-normal area occupied, or activity area)
RESPONSE TIME: Occur with 2-5 hours. Repairs completed within 7-10 days
PRIORITY 3- Routine
Definition: Routine and aesthetic issues not classified as Maintenance Repair Team ( MRT ) or Preventative Maintenance (PM) and have little to no impact on normal school operation. Routine work includes the following types of problems:- Installation of classroom boards
- Damaged interior door locks or handles
- Minor painting
- Replacement/repair of a single unit ventilator
- Replacement/repair of restroom plumbing fixtures
RESPONSE TIME: Within 14 days or less, Work completed within 60 days
PRIORITY 4- Project, Deferred and Schedule WorkDefinition: Work scheduled through the 90 day recurrent seeps on MRT and PM, in addition to non-urgent projects that are deferred to summer months based on accessibility issues or possible disruption to normal school operations. Deferred Work Orders include:- Minor painting and repairs
- Maintenance projects scheduled for completion during summer or winter break
- Parking lot overlays
- Transportable building renovations
RESPONSE TIME: As determined by scheduling and available funding.