Horn Elementary

    • pic1
    • pic2
    • pic3
    • pic4
    • pic5

Description

  • The new 85,500-square-foot Horn Elementary School is a replacement campus for a building that was originally opened in 1945.

    The 750-student, two-story school boasts special rooms designed to meet the specific needs of multiple magnet programs, including a creative writing lab with new computers and a dedicated music room. The school was built in a way that will use about 25 percent less energy overall.

    750 Student Elementary School Replacement on the existing campus (Pre-K to Grade 5).

Features

    • Larger cafeteria, library help accommodate growing enrollment
    • Specialized classrooms support magnet program
    • Need for temporary buildings eliminated
    • New athletic fields

Project Status

  • Construction is complete and the project is being closed out. The 1-year warranty period is complete.



Information

  • Horn Elementary School
    4530 Holly Street
    Houston, Texas 77401
    Phone: 713-295-5264
    Fax: 713-295-5286

Facts

    • Project C-178
    • Budget: $15,146,699
    • Project Type: New Schools: Replacements
    • Current Phase: Warranty Phase
    • Progress: 100%

Project Information

    • Feeder: Bellaire High School
    • District: District V - Michael L. Lunceford
    • CMPA: N/A
    • Manager: Meredith Smith
    • Contractor: Drymalla Construction
    • Architect: English + Associates

Video

  • horn ES Video
     
    Horn ES Video 2