Lovett Elementary School received a new building with funds from the 2007 bond program to replace a building in decline. The new school now can accommodate 750 students.
The fine arts magnet school includes new technology in every classroom with a larger library than the previous campus, as well as new fine arts facilities.
The school includes a band room behind the stage with glass doors that open out to a covered play area, allowing for outdoor music performances. The building also features more natural light to aid in energy reduction.
750 Student Elementary School Replacement on existing campus (pre-k to grade 5)