Hogg Middle School
Description
-
Hogg Middle School is located in the historic Heights area of Houston. The school offers a magnet program for Science, Technology, Engineering, and Mathematics. The school was named after James S. Hogg, the first native born governor of Texas. The Hogg estate donated the land on which Hogg Junior High School was built in 1926.
Scope of Work
-
Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, new lighting, a new bus canopy, paving repairs, restroom upgrades, improved interior finishes, auditorium seating, bleachers, signage, and ADA code compliance.
Project Status
-
Installation of the new auditorium seating is complete. Renovations in the science building are substantially complete and the renovation of the first floor restrooms will be complete in October. Upgrades to the main electrical service are scheduled for winter break. HVAC system replacement is ongoing. Installation of the new PA system is complete.
Key Facts
-
- Budget: $10,616,355
- Project Type: Renovations
- District: District I - Anna Eastman
- Location: 1100 Merrill
Have a question or comment?
-
Please submit your question or suggestion about this school project to bondinfo@houstonisd.org
and an HISD representative will follow up.
Information
-
IndicatorTarget Construction Start2nd Qtr. 2013Target Construction Completion4th Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Sizwe LewisArchitect: Harrison Kornberg ArchitectsContractor: DivisionOne ConstructionCMPA: N/AGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/ plumbing systems improvements, restrooms upgrade, bus drive creation, renovation of science labs, and new administration area.StatusPhase 2 is near completion. Canopy and bus drive is in progress. New boiler(s) and Chiller installation is moving forward.NotesnoneIndicatorTarget Construction Start4th Qtr. 2013Target Construction Completion2nd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: Ambrose McEnany & House ArchitectsContractor: ICI ConstructionCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, electrical improvements, a suspended ceiling, exterior wall finishes, a new PA system, new door hardware, restroom upgrades, paving improvements, and ADA code compliance.StatusFinal permit inspections are being performed on the renovation contract. Revised closeout documents are being submitted. The upgrade to the main electrical service is complete.NotesThe original general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above.IndicatorTarget Construction Start2nd Qtr. 2013Target Construction Completion2nd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: Natex CorporationContractor: Prime ContractorsCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, exterior drainage, reception area modifications, fire alarm upgrade, flooring and fencing replacement, sitework, and ADA code compliance.StatusThe renovation project is complete and being closed out.NotesA separate roof project is anticipated to be presented for approval to the school board in April 2014, with construction scheduled to occur through the third quarter 2014.IndicatorTarget Construction Start2nd Qtr. 2014Target Construction Completion4th Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: RdlR ArchitectsContractor: KBRCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance.StatusThe summer renovation of restrooms, lighting replacement, and accessibility ramp replacement is complete and being closed out. Additional safety/security scope is being reviewed and priced.NotesnoneIndicatorTarget Construction Start2nd Qtr. 2014Target Construction Completion4th Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: PBK ArchitectsContractor: Prime ContractorsCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, lighting, playground equipment, technology improvements, and ADA code compliance.StatusThe renovation of this school has been suspended and the students relocated to Rhoads ES. HISD Administration is working with the school leadership to determine next steps.NotesThe project schedule has been adjusted to reflect the negotiated schedule with the awarded contractor.IndicatorTarget Construction Start4th Qtr. 2013Target Construction Completion3rd Qtr. 2014PhaseConstruction% of Phase98%Project TeamManager: Chris KoeperArchitect: Prozign ArchitectsContractor: ICI ConstructionCMPA: N/AGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance.StatusFinal signage, misc. change orders and air handling unit replacement will take place through second quarter 2014. Controls will be installed concurrently with the air handling unit replacement. Low voltage systems will be installed during the summer of 2014.NotesThe original general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above.IndicatorTarget Construction Start4th Qtr. 2012Target Construction Completion2nd Qtr. 2014PhaseComplete% of Phase100%Project TeamManager: Travis StanfordArchitect: RDC ArchitectsContractor: DT Construction Co.CMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, parking repairs, science laboratory upgrades, exterior window replacement, and ADA code compliance.StatusThe renovation project is complete and closed-out.NotesA separate roof project is anticipated to be presented for approval to the school board in April 2014, with construction scheduled to occur through the fourth quarter 2014.IndicatorTarget Construction Start2nd Qtr. 2012Target Construction Completion2nd Qtr. 2014PhaseClose-Out% of Phase95%Project TeamManager: Bruce GreenArchitect: Molina WalkerContractor: Prime ContractorsCMPA: Rice & GardnerGeneral OverviewRenovations, including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance.StatusCloseout Documents have been reviewed and are nearly complete. Roof replacement contract with Rain Seal Master is in progress.NotesnoneIndicatorTarget Construction Start3rd Qtr. 2013Target Construction Completion2nd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: Collaborate ArchitectsContractor: Prime ContractorsCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance.StatusThe change order for the completion of the elevator has been approved. Structural steel is due on site the week of October 6 with installation to follow. Completion is expected by the end of November.NotesnoneIndicatorTarget Construction StartTBDTarget Construction CompletionTBDPhaseTBD% of PhaseTBDProject TeamManager: Meredith SmithArchitect: PBK ArchitectsContractor: TBDCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance.StatusThis project scope is being re-evaluated.NotesThis project was placed on hold to give the Board of Education time to consider repurposing of the campus.IndicatorTarget Construction Start2nd Qtr. 2013Target Construction Completion2nd Qtr. 2014PhaseClose-Out% of Phase90%Project TeamManager: Bruce GreenArchitect: Cre8 ArchitectsContractor: Prime ContractorsCMPA: Rice & GardnerGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance.StatusThis project is in the Shearn, Kolter & Elrod package. The project is substantially complete and now in the close out stage.NotesnoneIndicatorTarget Construction Start2nd Qtr. 2014Target Construction Completion4th Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: Courtney Harper + Partners ArchitectsContractor: Jamail + SmithCMPA: AECOM Design
Annual Vendors: Harrison AlarmGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance.StatusThe renovation work is substantially complete and the project is being closed out.NotesnoneIndicatorTarget Construction Start2nd Qtr. 2013Target Construction Completion1st Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: Natex CorporationContractor: Prime ContractorsCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical systems upgrades, fire alarm upgrade, intercom replacement, markerboard replacement, flooring and fencing replacement, sitework, and ADA code compliance.StatusThe renovation project is complete and closed-out. The final pay application will be submitted with the closeout documents for Burbank ES.NotesnoneIndicatorTarget Construction Start1st Qtr. 2014Target Construction Completion3rd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: PBK ArchitectsContractor: Prime ContractorsCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, roofing repairs, technology improvements, and ADA code compliance.StatusThe creation of a new science classroom and additional conference rooms is substantially complete. The renovation contract is ready for closeout.NotesThe project schedule has been adjusted to reflect the negotiated schedule with the awarded contractor.IndicatorTarget Construction Start3rd Qtr. 2013Target Construction Completion2nd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: MLB and AssociatesContractor: Prime ContractorsCMPA: AECOM DesignGeneral OverviewRenovations including safety/security improvements, mechanical/electrical/plumbing system improvements, exterior doors, door hardware, restrooms upgrade, replacement of new elevator, and ADA code compliance.StatusCloseout documents and the final pay application have been reviewed and are being submitted to HISD.NotesnoneIndicatorTarget Construction Start4th Qtr. 2013Target Construction Completion2nd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: Ambrose McEnany & House ArchitectsContractor: ICI ConstructionCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, exterior doors, door hardware, restrooms upgrade, replacement of new elevator, and ADA code compliance.StatusFinal permit inspections are being performed. Revised closeout documents are being submitted.NotesThe original general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above.IndicatorTarget Construction Start4th Qtr. 2013Target Construction Completion2nd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: Ambrose McEnany & House ArchitectsContractor: ICI ConstructionCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, lighting, exterior, interior doors and hardware, window replacements, restrooms upgrade, fencing and ADA code compliance.StatusFinal permit inspections are being performed. Revised closeout documents are being submitted.NotesThe original general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above.IndicatorTarget Construction Start1st Qtr. 2014Target Construction Completion4th Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: English + Associates ArchitectsContractor: Comex CorporationCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, new lighting, a new bus canopy, paving repairs, restroom upgrades, improved interior finishes, auditorium seating, bleachers, signage, and ADA code compliance.StatusInstallation of the new auditorium seating is complete. Renovations in the science building are substantially complete and the renovation of the first floor restrooms will be complete in October. Upgrades to the main electrical service are scheduled for winter break. HVAC system replacement is ongoing. Installation of the new PA system is complete.NotesIn addition to the 2007 scope of work the 2012 restroom renovation work will continue with the same project team through third quarter 2015.IndicatorTarget Construction Start4th Qtr. 2012Target Construction Completion4th Qtr. 2013PhaseClose-Out% of Phase90%Project TeamManager: Bruce GreenArchitect: Ambrose & HouseContractor: Prime ContractorsCMPA: Rice & GardnerGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements and ADA code compliance.StatusConstruction is complete and in the closeout phase. The project is under warranty.NotesnoneIndicatorTarget Construction Start1st Qtr. 2011Target Construction Completion3rd Qtr. 2012PhaseClose-Out% of Phase90%Project TeamManager: Bruce GreenArchitect: Autoarch ArchitectsContractor: Summit BuildersCMPA: Rice & GardnerGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance.StatusCloseout documents are complete. The original contractor failed to complete punch list items. A job order contractor and annual vendors are completing this work at the cost of the original contractor.NotesnoneIndicatorTarget Construction Start1st Qtr. 2012Target Construction Completion1st Qtr. 2014PhaseClose-Out% of Phase50%Project TeamManager: Meredith SmithArchitect: Corgan+PBAContractor: First Nat. Ins./ComexCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, restroom upgrades, roof repairs, parking lot expansion, and ADA code compliance.StatusPunch list work is nearing completion.NotesThe original general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above.IndicatorTarget Construction Start2nd Qtr. 2014Target Construction Completion4th Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: RWS ArchitectsContractor: ICI ConstructionCMPA: Rice & Gardner Consultants, Inc.General OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, refurbishing exterior and interior finishes, science laboratory upgrades, and ADA code compliance modifications.StatusConstruction is near completion.NotesPhase 1 was completed and project team is in final negotiations for close-out of the original contract.IndicatorTarget Construction Start2nd Qtr. 2014Target Construction Completion3rd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: Hill + Swart Architects, Inc.Contractor: KBRCMPA: AECOM DesignGeneral OverviewRenovations include safety/security systems improvements, mechanical/electrical/plumbing systems, fire alarm repair, intercom replacement, door and hardware replacement, science lab venting and fume hoods, sitework, construction of a fire truck access lane, and ADA code compliance.StatusThe lighting replacement is complete with final permit inspections proceeding. The project will be closed out in October.NotesnoneIndicatorTarget Construction Start2nd Qtr. 2013Target Construction Completion3rd Qtr. 2014PhaseClose-Out% of Phase90%Project TeamManager: Bruce GreenArchitect: Cre8 ArchitectsContractor: Prime ContractorsCMPA: Rice & GardnerGeneral OverviewRenovations including safety/security systems improvements and ADA code compliance.StatusThis project is in the Shearn, Kolter & Elrod package. The project is substantially complete and now in the close out stage.NotesnoneIndicatorTarget Construction Start2nd Qtr. 2014Target Construction Completion3rd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: PBK ArchitectsContractor: Prime ContractorsCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, technology improvements, and ADA code compliance.StatusThe renovation project is substantially complete, punchlist work is ongoing, and closeout documents are being prepared.NotesThe project schedule has been adjusted to reflect the negotiated schedule with the awarded contractor.IndicatorTarget Construction Start2nd Qtr. 2013Target Construction Completion1st Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: Natex ArchitectsContractor: Prime ContractorsCMPA: AECOM DesignGeneral OverviewRenovations include safety/security systems improvements, mechanical and electrical systems upgrades, fire alarm upgrade, intercom replacement, marker board replacement, parking lot expansion, flooring replacement, sitework, and ADA code compliance.StatusThe renovation project is complete and being closed out. The final pay application will be submitted with the close out documents for Burbank ES.NotesnoneIndicatorTarget Construction Start2nd Qtr. 2013Target Construction Completion2nd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: RWS ArchitectsContractor: Jamail & Smith, Ohms Electric, CLS, AMSCMPA: AECOM DesignGeneral OverviewRenovations including replacing electrical system components, resolution of structural issues, door repairs, PA system and ADA code compliance, tree trimming and treatment, and masonry repairs.StatusThe project is substantially complete and closeout documents are being reviewed.NotesnoneIndicatorTarget Construction Start3rd Qtr. 2012Target Construction Completion3rd Qtr. 2013PhaseClose-Out% of Phase90%Project TeamManager: Bruce GreenArchitect: Autoarch ArchitectsContractor: Satterfield & PontikesCMPA: Rice & GardnerGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing, and ADA code compliance. This project will also include an addition to the school that features a science lab and classrooms.StatusConstruction is complete and in the closeout phase. The project is under warranty.NotesAdditional egress lighting is being installed by annual vendor.IndicatorTarget Construction Start2nd Qtr. 2014Target Construction Completion3rd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: STOA International ArchitectsContractor: Jamail + SmithCMPA: AECOM Design
Annual Vendor: Atlas SignsGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance.StatusInstallation of the new lighting and marker boards will be complete in October. Replacement of the main electrical service weather head has been approved.NotesnoneIndicatorTarget Construction Start2nd Qtr. 2014Target Construction Completion4th Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: RdlR ArchitectsContractor: Level Infrastructure, LLCCMPA: AECOM DesignGeneral OverviewRenovations, including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance.StatusRenovation of the pre-K classrooms, administrative offices and restrooms, and replacement of exterior canopy walkways was complete at the end of the summer. Phase 2 student restroom renovations will be complete in mid-October with the next restroom renovation phase to follow.NotesnoneIndicatorTarget Construction Start2nd Qtr. 2013Target Construction Completion2nd Qtr. 2014PhaseConstruction% of Phase95%Project TeamManager: Bruce GreenArchitect: Sustaita ArchitectsContractor: DT ConstructionCMPA: Rice & GardnerGeneral OverviewRenovations including Replacement of storefronts; floor finishes (VCT, ceramic); ceiling finishes (acoustical tile); science classroom millwork; wall finishes (Paint, ceramic tile); masonry (CMU); restroom partitions, plumbing and fixture upgrades; exhaust fan additions; exterior lighting; site work.StatusThe new flooring, science classroom, and first floor restroom renovations are complete. The second floor restroom renovations and selected window and door replacements have been completed.NotesIn addition to the 2007 scope of work the 2012 restroom renovation work has been added and will be completed with the same project team.IndicatorTarget Construction Start2nd Qtr. 2013Target Construction Completion2nd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: Sustaita ArchitectsContractor: DT ConstructionCMPA: Rice & Gardner Consultants, Inc.General OverviewRenovations including storefront and curtain wall replacement, HVAC replacement and repairs, electrical panel replacement, electrical upgrades, door and window replacement, ceramic tile floor and carpet replacement, restroom renovations, plumbing fixture replacements, drinking fountain additions, millwork upgrades, suspended ceiling repairs and replacement, abatement, PA additions and signage.StatusThe project is substantially complete and is being closed out.NotesIn addition to the 2007 scope of work additional restroom renovations work was added to accommodate the special needs of this school. This additional scope will be completed late second quarter 2014.IndicatorTarget Construction Start2nd Qtr. 2014Target Construction Completion3rd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: Harrison Kornberg ArchitectsContractor: Jamail + SmithCMPA: AECOM Design
Annual Vendor: Ohms Electric, Harrison AlarmGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, roof repairs, restrooms upgrade, science laboratory upgrades, elevator installation, and ADA code compliance.StatusThe renovation work is substantially complete and the project is being closed out.NotesnoneIndicatorTarget Construction Start1st Qtr. 2013Target Construction Completion2nd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: STOA International ArchitectsContractor: Satterfield & PontikesCMPA: Rice & Gardner Consultants, IncGeneral OverviewA middle school addition and renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance.StatusThe school has moved into the new addition. Final site work, punch list and closeout is ongoing.NotesA separate roof project is anticipated to be presented for approval to the school board in April 2014, with construction scheduled to occur through the third quarter 2014.IndicatorTarget Construction Start2nd Qtr. 2014Target Construction Completion3rd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: Courtney Harper + Partners ArchitectsContractor: Jamail + SmithCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements and ADA compliance.StatusThe renovation work is substantially complete and project is being closed out.NotesnoneIndicatorTarget Construction Start2nd Qtr. 2013Target Construction Completion4th Qtr. 2013PhaseClose-Out% of Phase90%Project TeamManager: Bruce GreenArchitect: Cre8 ArchitectsContractor: Prime ContractorsCMPA: Rice & GardnerGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, site work, exterior and interior finishes, technology systems improvements, and ADA code compliance.StatusThis project is in the Shearn, Kolter & Elrod package. The project is substantially complete and now in the close out stage.NotesnoneIndicatorTarget Construction Start3rd Qtr. 2012Target Construction Completion4th Qtr. 2013PhaseClose-Out% of Phase90%Project TeamManager: Travis StanfordArchitect: CollaborateContractor: Comex CorporationCMPA: N/AGeneral OverviewNew school for 750 students.StatusConstruction is complete and is in the warranty phase. Certificate of Occupancy has been obtained. The campus occupied the new facility fourth quarter 2013. Final documentation is in progress for LEED certification.NotesnoneIndicatorTarget Construction Start2nd Qtr. 2014Target Construction Completion4th Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Travis StanfordArchitect: Brave ArchitectureContractor: Comex CorporationCMPA: N/AGeneral OverviewSchool expansion.StatusConstruction for the final phase (cafeteria, library and parking lot) is underway. The parking lot is 90% complete and is use by the school staff. Sitework and foundation for the building is approximately 20% and progressing well. Work is on schedule for Fall semester 2015 occupancy.NotesThe additional scope of work, including the library and cafeteria will be completed second quarter 2015.IndicatorTarget Construction Start3rd Qtr. 2012Target Construction Completion2nd Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: Collaborate ArchitectsContractor: Morganti ConstructionCMPA: Rice & Gardner Consultants, Inc.General OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. This project will include two additions to the school, a new multi-purpose building and a new Administration/Library wing. An additional project to replace the roof is currently planned for the third quarter 2014.StatusThe construction is near completion.NotesA separate roof project was approved by the school board in April 2014, with construction scheduled to occur through the third quarter 2014.IndicatorTarget Construction Start2nd Qtr. 2012Target Construction Completion4th Qtr. 2013PhaseClose-Out% of Phase90%Project TeamManager: Bruce GreenArchitect: RWS ArchitectsContractor: Prime ContractorsCMPA: Rice & GardnerGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance.StatusConstruction is complete and in the closeout phase. The project is under warranty.NotesnoneIndicatorTarget Construction Start1st Qtr. 2012Target Construction Completion4th Qtr. 2013PhaseClose-Out% of Phase90%Project TeamManager: Bruce GreenArchitect: Pfluger AssociatesContractor: Solidarity / Jamail & SmithCMPA: Rice & GardnerGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, exterior finishes, and ADA code compliance.StatusMinor punch list items are remaining to be completed. The HVAC replacement work is complete. Project is substantially complete.NotesnoneIndicatorTarget Construction Start1st Qtr. 2014Target Construction Completion4th Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: RWS ArchitectsContractor: Comex CorporationCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, replacing lighting, flooring, casework, ceilings in classrooms, revising admin area, new PA building alarm and fire alarm system.StatusThe renovation work is substantially complete, punchlist work is underway, and the project is being closed out.NotesnoneIndicatorTarget Construction Start4th Qtr. 2013Target Construction Completion3rd Qtr. 2014PhaseConstruction% of Phase95%Project TeamManager: Chris KoeperArchitect: Prozign ArchitectsContractor: ICI ConstructionCMPA: N/AGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance.StatusRenovation and interior finishes are ongoing, including the elevator installation and misc. long lead items. Low voltage systems will be complete by third quarter 2014.NotesThe original schedule was to start construction second quarter 2012 with an anticipated completion being first quarter 2013. The general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above.IndicatorTarget Construction Start2nd Qtr. 2014Target Construction Completion4th Qtr. 2014PhaseCloseout% of Phase100%Project TeamManager: Meredith SmithArchitect: VLK ArchitectsContractor: Renovation — Patriot Construction; Window Replacement — Jamail & SmithCMPA: AECOM DesignGeneral OverviewRenovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, interior and exterior finishes, windows, technology improvements, and ADA code compliance.StatusThe window replacement, marker board/window blinds replacement package, and student restroom renovation summer work packages are complete and being closed out.Notesnone
-
Last Updated: 10/27/2014