Law Elementary School

  • pic1

Description

  • Law Elementary is located in southeast Houston where it offers a focus on Science, Technology, Engineering and Math (STEM).

Scope of Work

  • Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, technology improvements, and ADA code compliance.

Project Status

  • The renovation project is substantially complete, punchlist work is ongoing, and closeout documents are being prepared.

Key Facts

    • Budget: $1,658,041
    • Project Type: Renovations
    • District: District IX - Wanda Adams
    • Location: 12401 South Coast

Have a question or comment?

  • Please submit your question or suggestion about this school project to bondinfo@houstonisd.org
    and an HISD representative will follow up.

Information

  • Indicator
    Indicator
    ID
    C-066 
    Project/School/Facility
    Budget
    $6,752,946 
    Target Construction Start
    2nd Qtr. 2013 
    Target Construction Completion
    4th Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Sizwe Lewis
    Architect: Harrison Kornberg Architects
    Contractor: DivisionOne Construction
    CMPA: N/A
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/ plumbing systems improvements, restrooms upgrade, bus drive creation, renovation of science labs, and new administration area. 
    Status
    Phase 2 is near completion. Canopy and bus drive is in progress. New boiler(s) and Chiller installation is moving forward. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-120 
    Project/School/Facility
    Budget
    $2,956,760 
    Target Construction Start
    4th Qtr. 2013 
    Target Construction Completion
    2nd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: Ambrose McEnany & House Architects
    Contractor: ICI Construction
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, electrical improvements, a suspended ceiling, exterior wall finishes, a new PA system, new door hardware, restroom upgrades, paving improvements, and ADA code compliance. 
    Status
    Final permit inspections are being performed on the renovation contract. Revised closeout documents are being submitted. The upgrade to the main electrical service is complete. 
    Notes
    The original general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above. 
    Indicator
    Indicator
    ID
    C-122 
    Project/School/Facility
    Budget
    $4,898,886 
    Target Construction Start
    2nd Qtr. 2013 
    Target Construction Completion
    2nd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: Natex Corporation
    Contractor: Prime Contractors
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, exterior drainage, reception area modifications, fire alarm upgrade, flooring and fencing replacement, sitework, and ADA code compliance. 
    Status
    The renovation project is complete and being closed out. 
    Notes
    A separate roof project is anticipated to be presented for approval to the school board in April 2014, with construction scheduled to occur through the third quarter 2014. 
    Indicator
    Indicator
    ID
    C-287 
    Project/School/Facility
    Budget
    $1,140,626 
    Target Construction Start
    2nd Qtr. 2014 
    Target Construction Completion
    4th Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: RdlR Architects
    Contractor: KBR
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
    Status
    The summer renovation of restrooms, lighting replacement, and accessibility ramp replacement is complete and being closed out. Additional safety/security scope is being reviewed and priced. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-123 
    Project/School/Facility
    Budget
    $1,755,413 
    Target Construction Start
    2nd Qtr. 2014 
    Target Construction Completion
    4th Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: PBK Architects
    Contractor: Prime Contractors
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, lighting, playground equipment, technology improvements, and ADA code compliance. 
    Status
    The renovation of this school has been suspended and the students relocated to Rhoads ES. HISD Administration is working with the school leadership to determine next steps. 
    Notes
    The project schedule has been adjusted to reflect the negotiated schedule with the awarded contractor. 
    Indicator
    Indicator
    ID
    C-290 
    Project/School/Facility
    Budget
    $4,454,891 
    Target Construction Start
    4th Qtr. 2013 
    Target Construction Completion
    3rd Qtr. 2014 
    Phase
    Construction 
    % of Phase
    98% 
    Project Team
    Manager: Chris Koeper
    Architect: Prozign Architects
    Contractor: ICI Construction
    CMPA: N/A
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
    Status
    Final signage, misc. change orders and air handling unit replacement will take place through second quarter 2014. Controls will be installed concurrently with the air handling unit replacement. Low voltage systems will be installed during the summer of 2014. 
    Notes
    The original general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above. 
    Indicator
    Indicator
    ID
    C-044 
    Project/School/Facility
    Budget
    $15,310,098 
    Target Construction Start
    4th Qtr. 2012 
    Target Construction Completion
    2nd Qtr. 2014 
    Phase
    Complete 
    % of Phase
    100% 
    Project Team
    Manager: Travis Stanford
    Architect: RDC Architects
    Contractor: DT Construction Co.
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, parking repairs, science laboratory upgrades, exterior window replacement, and ADA code compliance. 
    Status
    The renovation project is complete and closed-out. 
    Notes
    A separate roof project is anticipated to be presented for approval to the school board in April 2014, with construction scheduled to occur through the fourth quarter 2014. 
    Indicator
    Indicator
    ID
    C-297 
    Project/School/Facility
    Budget
    $3,606,928 
    Target Construction Start
    2nd Qtr. 2012 
    Target Construction Completion
    2nd Qtr. 2014 
    Phase
    Close-Out 
    % of Phase
    95% 
    Project Team
    Manager: Bruce Green
    Architect: Molina Walker
    Contractor: Prime Contractors
    CMPA: Rice & Gardner
     
    General Overview
    Renovations, including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
    Status
    Closeout Documents have been reviewed and are nearly complete. Roof replacement contract with Rain Seal Master is in progress. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-045 
    Project/School/Facility
    Budget
    $3,516,752 
    Target Construction Start
    3rd Qtr. 2013 
    Target Construction Completion
    2nd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: Collaborate Architects
    Contractor: Prime Contractors
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
    Status
    The change order for the completion of the elevator has been approved. Structural steel is due on site the week of October 6 with installation to follow. Completion is expected by the end of November. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-139 
    Project/School/Facility
    Budget
    $521,583 
    Target Construction Start
    TBD 
    Target Construction Completion
    TBD 
    Phase
    TBD 
    % of Phase
    TBD 
    Project Team
    Manager: Meredith Smith
    Architect: PBK Architects
    Contractor: TBD
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
    Status
    This project scope is being re-evaluated. 
    Notes
    This project was placed on hold to give the Board of Education time to consider repurposing of the campus. 
    Indicator
    Indicator
    ID
    C-148 
    Project/School/Facility
    Budget
    $1,248,399 
    Target Construction Start
    2nd Qtr. 2013 
    Target Construction Completion
    2nd Qtr. 2014 
    Phase
    Close-Out 
    % of Phase
    90% 
    Project Team
    Manager: Bruce Green
    Architect: Cre8 Architects
    Contractor: Prime Contractors
    CMPA: Rice & Gardner
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
    Status
    This project is in the Shearn, Kolter & Elrod package. The project is substantially complete and now in the close out stage. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-155 
    Project/School/Facility
    Budget
    $1,432,454 
    Target Construction Start
    2nd Qtr. 2014 
    Target Construction Completion
    4th Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: Courtney Harper + Partners Architects
    Contractor: Jamail + Smith
    CMPA: AECOM Design
    Annual Vendors: Harrison Alarm
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
    Status
    The renovation work is substantially complete and the project is being closed out. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-283 
    Project/School/Facility
    Budget
    $1,521,658 
    Target Construction Start
    2nd Qtr. 2013 
    Target Construction Completion
    1st Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: Natex Corporation
    Contractor: Prime Contractors
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical systems upgrades, fire alarm upgrade, intercom replacement, markerboard replacement, flooring and fencing replacement, sitework, and ADA code compliance. 
    Status
    The renovation project is complete and closed-out. The final pay application will be submitted with the closeout documents for Burbank ES. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-159 
    Project/School/Facility
    Budget
    $2,214,831 
    Target Construction Start
    1st Qtr. 2014 
    Target Construction Completion
    3rd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: PBK Architects
    Contractor: Prime Contractors
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, roofing repairs, technology improvements, and ADA code compliance. 
    Status
    The creation of a new science classroom and additional conference rooms is substantially complete. The renovation contract is ready for closeout. 
    Notes
    The project schedule has been adjusted to reflect the negotiated schedule with the awarded contractor. 
    Indicator
    Indicator
    ID
    C-262 
    Project/School/Facility
    Budget
    $3,948,795 
    Target Construction Start
    3rd Qtr. 2013 
    Target Construction Completion
    2nd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: MLB and Associates
    Contractor: Prime Contractors
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security improvements, mechanical/electrical/plumbing system improvements, exterior doors, door hardware, restrooms upgrade, replacement of new elevator, and ADA code compliance. 
    Status
    Closeout documents and the final pay application have been reviewed and are being submitted to HISD. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-049 
    Project/School/Facility
    Budget
    $2,823,535 
    Target Construction Start
    4th Qtr. 2013 
    Target Construction Completion
    2nd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: Ambrose McEnany & House Architects
    Contractor: ICI Construction
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, exterior doors, door hardware, restrooms upgrade, replacement of new elevator, and ADA code compliance. 
    Status
    Final permit inspections are being performed. Revised closeout documents are being submitted. 
    Notes
    The original general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above. 
    Indicator
    Indicator
    ID
    C-169 
    Project/School/Facility
    Budget
    $1,703,938 
    Target Construction Start
    4th Qtr. 2013 
    Target Construction Completion
    2nd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: Ambrose McEnany & House Architects
    Contractor: ICI Construction
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, lighting, exterior, interior doors and hardware, window replacements, restrooms upgrade, fencing and ADA code compliance. 
    Status
    Final permit inspections are being performed. Revised closeout documents are being submitted. 
    Notes
    The original general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above. 
    Indicator
    Indicator
    ID
    C-053 
    Project/School/Facility
    Budget
    $10,616,355 
    Target Construction Start
    1st Qtr. 2014 
    Target Construction Completion
    4th Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: English + Associates Architects
    Contractor: Comex Corporation
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, new lighting, a new bus canopy, paving repairs, restroom upgrades, improved interior finishes, auditorium seating, bleachers, signage, and ADA code compliance. 
    Status
    Installation of the new auditorium seating is complete. Renovations in the science building are substantially complete and the renovation of the first floor restrooms will be complete in October. Upgrades to the main electrical service are scheduled for winter break. HVAC system replacement is ongoing. Installation of the new PA system is complete. 
    Notes
    In addition to the 2007 scope of work the 2012 restroom renovation work will continue with the same project team through third quarter 2015. 
    Indicator
    Indicator
    ID
    C-050 
    Project/School/Facility
    Budget
    $3,428,277 
    Target Construction Start
    4th Qtr. 2012 
    Target Construction Completion
    4th Qtr. 2013 
    Phase
    Close-Out 
    % of Phase
    90% 
    Project Team
    Manager: Bruce Green
    Architect: Ambrose & House
    Contractor: Prime Contractors
    CMPA: Rice & Gardner
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements and ADA code compliance. 
    Status
    Construction is complete and in the closeout phase. The project is under warranty. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-054 
    Project/School/Facility
    Budget
    $14,347,354 
    Target Construction Start
    1st Qtr. 2011 
    Target Construction Completion
    3rd Qtr. 2012 
    Phase
    Close-Out 
    % of Phase
    90% 
    Project Team
    Manager: Bruce Green
    Architect: Autoarch Architects
    Contractor: Summit Builders
    CMPA: Rice & Gardner
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
    Status
    Closeout documents are complete. The original contractor failed to complete punch list items. A job order contractor and annual vendors are completing this work at the cost of the original contractor. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-182 
    Project/School/Facility
    Budget
    $1,526,081 
    Target Construction Start
    1st Qtr. 2012 
    Target Construction Completion
    1st Qtr. 2014 
    Phase
    Close-Out 
    % of Phase
    50% 
    Project Team
    Manager: Meredith Smith
    Architect: Corgan+PBA
    Contractor: First Nat. Ins./Comex
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, restroom upgrades, roof repairs, parking lot expansion, and ADA code compliance. 
    Status
    Punch list work is nearing completion. 
    Notes
    The original general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above. 
    Indicator
    Indicator
    ID
    C-055 
    Project/School/Facility
    Budget
    $10,779,749 
    Target Construction Start
    2nd Qtr. 2014 
    Target Construction Completion
    4th Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: RWS Architects
    Contractor: ICI Construction
    CMPA: Rice & Gardner Consultants, Inc.
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, refurbishing exterior and interior finishes, science laboratory upgrades, and ADA code compliance modifications. 
    Status
    Construction is near completion. 
    Notes
    Phase 1 was completed and project team is in final negotiations for close-out of the original contract. 
    Indicator
    Indicator
    ID
    C-079 
    Project/School/Facility
    Budget
    $4,348,962 
    Target Construction Start
    2nd Qtr. 2014 
    Target Construction Completion
    3rd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: Hill + Swart Architects, Inc.
    Contractor: KBR
    CMPA: AECOM Design
     
    General Overview
    Renovations include safety/security systems improvements, mechanical/electrical/plumbing systems, fire alarm repair, intercom replacement, door and hardware replacement, science lab venting and fume hoods, sitework, construction of a fire truck access lane, and ADA code compliance. 
    Status
    The lighting replacement is complete with final permit inspections proceeding. The project will be closed out in October. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-189 
    Project/School/Facility
    Budget
    $737,591 
    Target Construction Start
    2nd Qtr. 2013 
    Target Construction Completion
    3rd Qtr. 2014 
    Phase
    Close-Out 
    % of Phase
    90% 
    Project Team
    Manager: Bruce Green
    Architect: Cre8 Architects
    Contractor: Prime Contractors
    CMPA: Rice & Gardner
     
    General Overview
    Renovations including safety/security systems improvements and ADA code compliance. 
    Status
    This project is in the Shearn, Kolter & Elrod package. The project is substantially complete and now in the close out stage. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-263 
    Project/School/Facility
    Budget
    $1,658,041 
    Target Construction Start
    2nd Qtr. 2014 
    Target Construction Completion
    3rd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: PBK Architects
    Contractor: Prime Contractors
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, technology improvements, and ADA code compliance. 
    Status
    The renovation project is substantially complete, punchlist work is ongoing, and closeout documents are being prepared. 
    Notes
    The project schedule has been adjusted to reflect the negotiated schedule with the awarded contractor. 
    Indicator
    Indicator
    ID
    C-128 
    Project/School/Facility
    Budget
    $1,902,951 
    Target Construction Start
    2nd Qtr. 2013 
    Target Construction Completion
    1st Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: Natex Architects
    Contractor: Prime Contractors
    CMPA: AECOM Design
     
    General Overview
    Renovations include safety/security systems improvements, mechanical and electrical systems upgrades, fire alarm upgrade, intercom replacement, marker board replacement, parking lot expansion, flooring replacement, sitework, and ADA code compliance. 
    Status
    The renovation project is complete and being closed out. The final pay application will be submitted with the close out documents for Burbank ES. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-201 
    Project/School/Facility
    Budget
    $1,042,813 
    Target Construction Start
    2nd Qtr. 2013 
    Target Construction Completion
    2nd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: RWS Architects
    Contractor: Jamail & Smith, Ohms Electric, CLS, AMS
    CMPA: AECOM Design
     
    General Overview
    Renovations including replacing electrical system components, resolution of structural issues, door repairs, PA system and ADA code compliance, tree trimming and treatment, and masonry repairs. 
    Status
    The project is substantially complete and closeout documents are being reviewed. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-062 
    Project/School/Facility
    Budget
    $12,053,989 
    Target Construction Start
    3rd Qtr. 2012 
    Target Construction Completion
    3rd Qtr. 2013 
    Phase
    Close-Out 
    % of Phase
    90% 
    Project Team
    Manager: Bruce Green
    Architect: Autoarch Architects
    Contractor: Satterfield & Pontikes
    CMPA: Rice & Gardner
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing, and ADA code compliance. This project will also include an addition to the school that features a science lab and classrooms. 
    Status
    Construction is complete and in the closeout phase. The project is under warranty. 
    Notes
    Additional egress lighting is being installed by annual vendor. 
    Indicator
    Indicator
    ID
    C-222 
    Project/School/Facility
    Budget
    $839,304 
    Target Construction Start
    2nd Qtr. 2014 
    Target Construction Completion
    3rd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: STOA International Architects
    Contractor: Jamail + Smith
    CMPA: AECOM Design
    Annual Vendor: Atlas Signs
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
    Status
    Installation of the new lighting and marker boards will be complete in October. Replacement of the main electrical service weather head has been approved. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-223 
    Project/School/Facility
    Budget
    $3,434,141 
    Target Construction Start
    2nd Qtr. 2014 
    Target Construction Completion
    4th Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: RdlR Architects
    Contractor: Level Infrastructure, LLC
    CMPA: AECOM Design
     
    General Overview
    Renovations, including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
    Status
    Renovation of the pre-K classrooms, administrative offices and restrooms, and replacement of exterior canopy walkways was complete at the end of the summer. Phase 2 student restroom renovations will be complete in mid-October with the next restroom renovation phase to follow. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-060 
    Project/School/Facility
    Budget
    $1,758,507 
    Target Construction Start
    2nd Qtr. 2013 
    Target Construction Completion
    2nd Qtr. 2014 
    Phase
    Construction 
    % of Phase
    95% 
    Project Team
    Manager: Bruce Green
    Architect: Sustaita Architects
    Contractor: DT Construction
    CMPA: Rice & Gardner
     
    General Overview
    Renovations including Replacement of storefronts; floor finishes (VCT, ceramic); ceiling finishes (acoustical tile); science classroom millwork; wall finishes (Paint, ceramic tile); masonry (CMU); restroom partitions, plumbing and fixture upgrades; exhaust fan additions; exterior lighting; site work. 
    Status
    The new flooring, science classroom, and first floor restroom renovations are complete. The second floor restroom renovations and selected window and door replacements have been completed. 
    Notes
    In addition to the 2007 scope of work the 2012 restroom renovation work has been added and will be completed with the same project team. 
    Indicator
    Indicator
    ID
    C-039 
    Project/School/Facility
    Budget
    $8,177,171 
    Target Construction Start
    2nd Qtr. 2013 
    Target Construction Completion
    2nd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: Sustaita Architects
    Contractor: DT Construction
    CMPA: Rice & Gardner Consultants, Inc.
     
    General Overview
    Renovations including storefront and curtain wall replacement, HVAC replacement and repairs, electrical panel replacement, electrical upgrades, door and window replacement, ceramic tile floor and carpet replacement, restroom renovations, plumbing fixture replacements, drinking fountain additions, millwork upgrades, suspended ceiling repairs and replacement, abatement, PA additions and signage. 
    Status
    The project is substantially complete and is being closed out. 
    Notes
    In addition to the 2007 scope of work additional restroom renovations work was added to accommodate the special needs of this school. This additional scope will be completed late second quarter 2014. 
    Indicator
    Indicator
    ID
    C-232 
    Project/School/Facility
    Budget
    $3,916,464 
    Target Construction Start
    2nd Qtr. 2014 
    Target Construction Completion
    3rd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: Harrison Kornberg Architects
    Contractor: Jamail + Smith
    CMPA: AECOM Design
    Annual Vendor: Ohms Electric, Harrison Alarm
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, roof repairs, restrooms upgrade, science laboratory upgrades, elevator installation, and ADA code compliance. 
    Status
    The renovation work is substantially complete and the project is being closed out. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-234 
    Project/School/Facility
    Budget
    $11,514,609 
    Target Construction Start
    1st Qtr. 2013 
    Target Construction Completion
    2nd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: STOA International Architects
    Contractor: Satterfield & Pontikes
    CMPA: Rice & Gardner Consultants, Inc
     
    General Overview
    A middle school addition and renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
    Status
    The school has moved into the new addition. Final site work, punch list and closeout is ongoing. 
    Notes
    A separate roof project is anticipated to be presented for approval to the school board in April 2014, with construction scheduled to occur through the third quarter 2014. 
    Indicator
    Indicator
    ID
    C-281 
    Project/School/Facility
    Budget
    $854,366 
    Target Construction Start
    2nd Qtr. 2014 
    Target Construction Completion
    3rd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: Courtney Harper + Partners Architects
    Contractor: Jamail + Smith
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements and ADA compliance. 
    Status
    The renovation work is substantially complete and project is being closed out. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-239 
    Project/School/Facility
    Budget
    $2,479,845 
    Target Construction Start
    2nd Qtr. 2013 
    Target Construction Completion
    4th Qtr. 2013 
    Phase
    Close-Out 
    % of Phase
    90% 
    Project Team
    Manager: Bruce Green
    Architect: Cre8 Architects
    Contractor: Prime Contractors
    CMPA: Rice & Gardner
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, site work, exterior and interior finishes, technology systems improvements, and ADA code compliance. 
    Status
    This project is in the Shearn, Kolter & Elrod package. The project is substantially complete and now in the close out stage. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-240 
    Project/School/Facility
    Budget
    $18,189,731 
    Target Construction Start
    3rd Qtr. 2012 
    Target Construction Completion
    4th Qtr. 2013 
    Phase
    Close-Out 
    % of Phase
    90% 
    Project Team
    Manager: Travis Stanford
    Architect: Collaborate
    Contractor: Comex Corporation
    CMPA: N/A
     
    General Overview
    New school for 750 students. 
    Status
    Construction is complete and is in the warranty phase. Certificate of Occupancy has been obtained. The campus occupied the new facility fourth quarter 2013. Final documentation is in progress for LEED certification. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-242 
    Project/School/Facility
    Budget
    $17,050,846 
    Target Construction Start
    2nd Qtr. 2014 
    Target Construction Completion
    4th Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Travis Stanford
    Architect: Brave Architecture
    Contractor: Comex Corporation
    CMPA: N/A
     
    General Overview
    School expansion. 
    Status
    Construction for the final phase (cafeteria, library and parking lot) is underway. The parking lot is 90% complete and is use by the school staff. Sitework and foundation for the building is approximately 20% and progressing well. Work is on schedule for Fall semester 2015 occupancy. 
    Notes
    The additional scope of work, including the library and cafeteria will be completed second quarter 2015. 
    Indicator
    Indicator
    ID
    C-244 
    Project/School/Facility
    Budget
    $13,493,587 
    Target Construction Start
    3rd Qtr. 2012 
    Target Construction Completion
    2nd Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: Collaborate Architects
    Contractor: Morganti Construction
    CMPA: Rice & Gardner Consultants, Inc.
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. This project will include two additions to the school, a new multi-purpose building and a new Administration/Library wing. An additional project to replace the roof is currently planned for the third quarter 2014. 
    Status
    The construction is near completion. 
    Notes
    A separate roof project was approved by the school board in April 2014, with construction scheduled to occur through the third quarter 2014. 
    Indicator
    Indicator
    ID
    C-098 
    Project/School/Facility
    Budget
    $3,230,362 
    Target Construction Start
    2nd Qtr. 2012 
    Target Construction Completion
    4th Qtr. 2013 
    Phase
    Close-Out 
    % of Phase
    90% 
    Project Team
    Manager: Bruce Green
    Architect: RWS Architects
    Contractor: Prime Contractors
    CMPA: Rice & Gardner
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
    Status
    Construction is complete and in the closeout phase. The project is under warranty. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-248 
    Project/School/Facility
    Budget
    $6,310,699 
    Target Construction Start
    1st Qtr. 2012 
    Target Construction Completion
    4th Qtr. 2013 
    Phase
    Close-Out 
    % of Phase
    90% 
    Project Team
    Manager: Bruce Green
    Architect: Pfluger Associates
    Contractor: Solidarity / Jamail & Smith
    CMPA: Rice & Gardner
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, exterior finishes, and ADA code compliance. 
    Status
    Minor punch list items are remaining to be completed. The HVAC replacement work is complete. Project is substantially complete. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-252 
    Project/School/Facility
    Budget
    $3,177,976 
    Target Construction Start
    1st Qtr. 2014 
    Target Construction Completion
    4th Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: RWS Architects
    Contractor: Comex Corporation
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, replacing lighting, flooring, casework, ceilings in classrooms, revising admin area, new PA building alarm and fire alarm system. 
    Status
    The renovation work is substantially complete, punchlist work is underway, and the project is being closed out. 
    Notes
    none 
    Indicator
    Indicator
    ID
    C-258 
    Project/School/Facility
    Budget
    $3,712,925 
    Target Construction Start
    4th Qtr. 2013 
    Target Construction Completion
    3rd Qtr. 2014 
    Phase
    Construction 
    % of Phase
    95% 
    Project Team
    Manager: Chris Koeper
    Architect: Prozign Architects
    Contractor: ICI Construction
    CMPA: N/A
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, and ADA code compliance. 
    Status
    Renovation and interior finishes are ongoing, including the elevator installation and misc. long lead items. Low voltage systems will be complete by third quarter 2014. 
    Notes
    The original schedule was to start construction second quarter 2012 with an anticipated completion being first quarter 2013. The general contractor was RHJ-JOC Inc., which defaulted on their contract in December 2012. HISD has since negotiated with the surety company and contracted with a completion contractor to restart and complete the construction scope, as noted in the information section above. 
    Indicator
    Indicator
    ID
    C-260 
    Project/School/Facility
    Budget
    $4,252,358 
    Target Construction Start
    2nd Qtr. 2014 
    Target Construction Completion
    4th Qtr. 2014 
    Phase
    Closeout 
    % of Phase
    100% 
    Project Team
    Manager: Meredith Smith
    Architect: VLK Architects
    Contractor: Renovation — Patriot Construction; Window Replacement — Jamail & Smith
    CMPA: AECOM Design
     
    General Overview
    Renovations including safety/security systems improvements, mechanical/electrical/plumbing systems improvements, interior and exterior finishes, windows, technology improvements, and ADA code compliance. 
    Status
    The window replacement, marker board/window blinds replacement package, and student restroom renovation summer work packages are complete and being closed out. 
    Notes
    none 
  • Last Updated: 10/27/2014