- Houston Independent School District
- Non-Bond Projects
- Robinson Elementary
Building Programs
Page Navigation
- Home
- Business Operations Home
- Construction Services (Bond) - Forms & Documents
- HISD 2012 Bond
- Non-Bond Projects
- 2007 Bond Archive
- Doing business with HISD
- Project Advisory Teams
- Bond Oversight Committee
- Bond Audit Reports
- Communications
- Green Schools
- 21st Century Schools
- Real Estate
- HISD Design Guidelines
- Videos on the Bond
- Capital Planning Steering Committee
Robinson Elementary
-
Robinson Elementary School sustained significant damages resulting from Hurricane Harvey. As a result, students spent the 2017 fall semester split between two locations at Pleasantville Elementary and neighboring Holland Middle.Scope of Work
The building required a major interior renovation. All porous surfaces below about 4 feet were removed and replaced, as were cabinets, wood surfaces, vinyl floor tiles, furniture, classroom supplies, and education materials. Additionally, the entire building was professionally cleaned, sanitized and inspected.
Project Status
All work is complete, and students returned to the campus Jan. 8, 2018Note: This project is using funding sources unrelated to the 2012 bond program.
-
KEY INFORMATIONTrustee: Judith Cruz
Location: 12425 Woodforest Blvd.